Drilling - After drilling

What to Expect After Your Well is Drilled

  1. Well Documentation and Registration
    Once your well is successfully drilled, we complete all required documentation and register the well with the relevant authorities. This includes recording the well’s specific details for regulatory compliance.

  2. Design and Installation of Pumping System
    After the well is complete, we design and install a downhole pumping system tailored to your specific needs and usage requirements. This ensures that your well operates efficiently and meets your water supply demands.

  3. Pumping Test and Aquifer Testing (if required)
    Depending on regulatory requirements or licensing conditions, a pumping test may be necessary. If required, we can conduct an aquifer test to assess the well’s capacity and long-term sustainability.

  4. Water Quality and Stabilization
    In some cases, you may be able to use the well immediately; however, if the water is cloudy or discolored due to the drilling process, it’s recommended to pump the well until the water clears and the chemistry stabilizes. Once the water reaches a consistent clarity and color, you can then take a sample for lab analysis to confirm water quality.